Utilities
Up to 10 socket/switch relocations in total and up to 2 lighting outlets. Up to 4 individual water or drainage outlets within the existing kitchen and bathroom. Relocations up to 3 m, subject to technical conditions.
For adjusting sockets, lighting and finishes to everyday needs. Smooth walls and mid-range materials. Work follows an agreed layout, without an interior design project.
Labour only. Materials are additional.

Net rates per m² of floor area cover labour only. Materials are additional, based on the agreed collection and budget. Premium design is charged separately. Scope and price are confirmed before ordering.
Up to 10 socket/switch relocations in total and up to 2 lighting outlets. Up to 4 individual water or drainage outlets within the existing kitchen and bathroom. Relocations up to 3 m, subject to technical conditions.
Full finishing skim coat, sanding, primer and washable paint. Up to 3 wall colours; white ceilings.
Straight-laid hard-wearing laminate or click vinyl from the collection, skirting and profiles. Up to 2 door sets with adjustable frames and fittings. Up to 8 agreed ceiling, pendant or wall lights.
Waterproofing, 60 × 60 or 60 × 120 cm tiles, cement grout and sanitary silicone. Enclosed WC frame and wall-hung toilet. Shower tray with glass or an acrylic bathtub with a panel.
Basin unit up to 80 cm, mirror, taps and mid-range shower set. Choose colours, textures and models from agreed collections within the budget.
Labour, material purchases and design are separate items. Materials are an estimated budget with a 10% reserve, rounded to the nearest hundred złoty. Delivery and carrying materials upstairs are extra.
Doors means internal door sets with frames and fittings, not the number of rooms. Installation is part of the labour; purchasing the sets is covered by the separate materials budget.
Main building services must be ready and surfaces suitable for finishing. Materials, scope, limits and changes are recorded in the estimate before work starts.
One electrical point is one socket/switch mechanism or lighting outlet. A block of 3 mechanisms counts as 3 points. New Premium circuits follow the design and agreed cable lengths.
Cold water, hot water and drainage each count separately. Fully relocating a basin means 3 outlets, not one. Work stays within existing wet areas with the required drainage slope; shared risers and building networks are excluded.
The 45 m² model assumes 2.7 m ceilings; Standard and Comfort: one 5 m² bathroom and 2 doors; Premium: two 4 m² bathrooms and 5 doors. Different layouts, areas or complex flooring patterns require a revised estimate.
Main building services must be ready and surfaces suitable for finishing. Materials, scope, limits and changes are recorded in the estimate before work starts.
One electrical point is one socket/switch mechanism or lighting outlet. A block of 3 mechanisms counts as 3 points. New Premium circuits follow the design and agreed cable lengths.
Cold water, hot water and drainage each count separately. Fully relocating a basin means 3 outlets, not one. Work stays within existing wet areas with the required drainage slope; shared risers and building networks are excluded.
The 45 m² model assumes 2.7 m ceilings; Standard and Comfort: one 5 m² bathroom and 2 doors; Premium: two 4 m² bathrooms and 5 doors. Different layouts, areas or complex flooring patterns require a revised estimate.
Call or message us to discuss the work and arrange a site visit. Visits within Wrocław are free.