Bathroom renovation.
We prepare plumbing and waterproofing, lay tiles and fit the agreed bathroom fixtures.

Waterproofing and drainage.
- Before tiling, we prepare surfaces, waterproofing and drains.
- The layout is checked against room dimensions and selected fixtures.
What work is included?
After a site visit, we agree the scope and quote. We specify which work and materials are included and which need a separate agreement.
Discuss your renovationLayout and connections
Checking dimensions, water points, drainage and electrical provisions against the selected fixtures.
Waterproofing
Preparing substrates and using a coordinated waterproofing system in agreed wet areas before tiling.
Tiling and details
Planning tile layouts, niches and junctions. Shower falls are matched to the drainage solution.
Fixtures and fitting
Installing sanitaryware, taps and agreed equipment, sealing junctions and checking operation.
Example interiors.
These visualisations show example interiors, not our completed projects. Materials and solutions are selected individually.






Tile layout before fitting.
We agree tile sizes, grout lines, niches and tap positions. This lets us plan cuts and joins before tiling starts.
How does the work proceed?
Conversation and site visit
We discuss your needs, inspect the space and take measurements. A finished design is not needed for the first conversation.
Scope and quote
We agree the work, materials, price, deliveries and start date.
Renovation
We coordinate the trades. Changes to scope, price or timing are discussed before the work is done.
Handover
We check the work and equipment together. Handover findings are recorded in writing.
Renovation questions.
Can every bathroom have a walk-in shower?
Not always. We check floor depth, drainage routes, slope and available space before recommending a suitable solution.
Do you renovate small bathrooms?
Yes. In a compact room, fixture dimensions, door swings, storage and usable clearances are particularly important.
When should I choose the taps?
Any fixtures affecting connections, particularly concealed fittings, should be selected before installation points are prepared.
What can extend the schedule?
Hidden installation defects, layout changes, equipment availability and drying times. We do not shorten necessary curing periods at the expense of quality.
What do we need for a quote?
Tell us the floor area, current condition and planned work. Photos and your preferred timing will also help.
Discuss your renovationArrange a renovation consultation.
Call or message us to discuss the work and arrange a site visit. Visits within Wrocław are free.



